
Australia’s deepest Reverse Circulation (RC) hole – and we’re already pushing the limit further.
In a significant milestone for Australia’s exploration sector, Topdrill is proud to announce that we have successfully broken the record for the deepest RC (Reverse Circulation) drill hole in the country with a spectacular 870 metres at the Benz Mining Corp. Glenburgh Project in the Murchison region. Rig 1 (a Schramm T685) reached this milestone on 7 October 2025. In fact, having recently extended the depth to 876 metres, Topdrill is already advancing the benchmark even further.
Why this milestone matters.
Being able to drill to this depth is a testament to operational excellence, quality equipment choices, and disciplined execution. At a time when exploration is about deeper targets, tighter timelines, and higher expectations, this accomplishment underscores Topdrill’s leadership in drilling services and capability in high-performance execution.
How we achieved it.
- Our Rig 1, equipped with the Schramm T685 platform, achieved the depth over just six shifts, delivering dry, high-quality samples across the full interval.
- Only one bit change was required—a tribute to our precision planning and resilient tooling. We utilised PCD bits supplied via Epiroc (via Schramm Powered by Epiroc Hammers & Bits) and Inloc® rods from Harlsan Pty Ltd—Australian-made, world-class components.
- The favourable ground conditions, combined with our team’s expertise and investment in best-in-class equipment allowed us to deliver a clean, continuous sample stream and drill advance that sets a new benchmark.
What it means for Topdrill and our clients.
- Capability validated. This achievement reinforces Topdrill’s standing as a trusted partner who can deliver complex challenges reliably and safely.
- Innovation realised. Through deliberate investment in equipment, tooling, and crew training, we’re delivering the next frontier of RC drilling depths.
- Client advantage. Deeper targets, efficient execution, and richer sample returns—opening the door to stronger exploration outcomes.
- Regionally rooted, globally competitive. This capability positions Topdrill strongly for Tier-1 miners, juniors, and service-partners across Australia.
Looking ahead
Topdrill isn’t resting on this milestone. Extending the depth to 876 metres already signals our determination to continuously push the envelope. We are preparing the next phase of operations, exploring further depth potential, refining our tooling and delivery models, and working closely with our clients to meet the most demanding exploration objectives.
Acknowledgements
This record is built on the dedication of our crew, the careful planning of our operations team, the trust of our client Benz Mining Corp., and the support of our equipment partners. Congratulations to the entire Rig 1 team and everyone who played a role in making this achievement possible.